Skip to content
Battery storage site representative of Moruya BESS.

Moruya BESS

Battery storage · In development · South Coast

Overview

A battery of up to 200 MW / 800 MWh at Moruya on the New South Wales South Coast.

A battery of up to 200 MW / 800 MWh at Moruya on the New South Wales South Coast, in development to strengthen network stability and store renewable energy for delivery at times of peak demand. The project will be located adjacent to the North Moruya Industrial precinct.

Key specifications

Up to200MW
Capacity
Up to800MWh
Storage
Battery storage
Technology
In development
Status
South Coast
Region

Project layout

Indicative site layout.

The project area adjacent to the North Moruya Industrial precinct, with the indicative battery, inverter and substation footprints and the indicative grid connection.

Indicative project layout for Moruya BESS: project area, battery, inverter and substation footprints and the indicative grid connection.
Indicative layout · Amey, November 2026